-
Flue Protection
flue-protection
-
Beam Pallet Stop
• Stops pallets from entering the flue spaces!
• Fits 2.75” deep by 4.75” or 6.5” tall beam face.
• Secures waterfall type wire deck in place for 1.75” x 1.75” spacing.
• Easy installation – slides directly over beam.
• Available in flush mount, 3” or 6” overhang.
• Can be made to fit other size wire spacing.
• Can be mounted with either a bolt under the rack or Tekscrews into the rack. -
Pallet Stops
The Pallet Stop prevents wall and product damage.
- 18" long x 5" tall, centered between rack frame, protects two skids at the same time.
- Anchors to the floor with two legs on either side of the frame.
- Mounting feet may be mounted against the wall.
-
Floor Pallet Stop
Reduce damage to walls and protect product stored along the perimeter walls when placing pallets!
• Easy installation! Only two ½” × 3” Tapcon anchors needed.
• Use on back-to-back situations to protect flue space.
• Use one or two per pallet space.
• 3/8” thick steel, 7” W × 6” H × 4” D
• Anchors behind guard to prevent pallets from ‘catching’. -
Rub Rail
Prevents potential damage to crossbars and rack corners from pallets by creating a guide for pallets.
- 4" tall x 1/4" thick steel bars.
- Available in 42" and 48".
- Mounted flush using double-end studs and weld nuts so that nothing “catches" on the hardware.
- Multiple bars can be used as bracing for the rack, providing additional reinforcement to the rack.
- Hardware included.
-
Pallet Guide/Stops
Two products in one! - Keeps flue space clear and prevents damage to walls behind rack.
- 4" tall x 1/4" thick steel bar with 10" return..
- Available in 42", 45" (42" with 3" overhang), 48", and 51" (48" with 3" overhang).
- Mounts flush to double end stud and weld nuts so that nothing "catches" on the hardware.
- Easy installation - hardware included.
- Creates additional reinforcement for the rack.
- Available without rear stop - see Pallet Guide.
- Hardware included.
-
Back of Rack
Back of Rack is designed to stop employees from pushing a skid off the back of the rack.
- High tensile steel brackets are 7 gage and are bolted to frames.
- Strong horizontal braces are secured in place with a 1/2" thick pin.
- Cut installation costs in half because there is no need for heavy netting, or the extreme hassle of netting installations.
- Low maintenance compared to broken straps, broken mesh panels and torn netting.
- Bracket measures 6" off of the frame.
- The 10 gage thick brace is 4" tall, 97-1/2" in length and is formed into a "C" channel for strength .
- 1/2" bracket hardware included.
- Use multiple braces for loose carton areas.
- Stocking in 8' sections, covering two pallet positions.
- Can be used in back-to-back rack design to protect flue space product from damage.
-
Savety Flue Guard
Stops Pallets From Entering Flue Spaces!
• 3" gap on both sides of the rack frame creates the required flue space.
• Thick steel construction withstands unit loading repeatedly.
• Available in 36", 42", and 48" as stock, but custom lengths are available.
• Mounts to front and rear of the frame, open or closed back, 1/2" hardware provided -
Beam Pallet Stop
• Stops pallets from entering the flue spaces!
• Fits 2.75” deep by 4.75” or 6.5” tall beam face.
• Secures waterfall type wire deck in place for 1.75” x 1.75” spacing.
• Easy installation – slides directly over beam.
• Available in flush mount, 3” or 6” overhang.
• Can be made to fit other size wire spacing.
• Can be mounted with either a bolt under the rack or Tekscrews into the rack.